EN VI

SILVER · Contract M27

M27 Contract Statistics

First Value1.69372026-06-30
Last Value2.51672026-09-15
Minimum0.6917
Maximum3.8439
Average2.2755
Total Records77

SILVER M27 Full Contract Lifecycle Chart

All Historical Values — 77 records

DateForward Points
2026-06-301.6937
2026-07-012.7155
2026-07-022.6577
2026-07-030.7281
2026-07-040.6917
2026-07-050.6917
2026-07-061.1716
2026-07-073.3313
2026-07-083.8439
2026-07-091.7611
2026-07-102.6495
2026-07-112.4960
2026-07-122.4960
2026-07-133.7780
2026-07-141.9589
2026-07-152.8592
2026-07-162.3676
2026-07-172.4133
2026-07-182.2925
2026-07-192.2925
2026-07-201.3708
2026-07-210.8352
2026-07-221.7583
2026-07-232.7815
2026-07-242.0156
2026-07-252.6570
2026-07-262.6570
2026-07-271.3467
2026-07-283.4663
2026-07-291.6744
2026-07-302.5477
2026-07-312.6613
2026-08-012.1170
2026-08-022.1170
2026-08-031.5383
2026-08-040.8833
2026-08-050.9616
2026-08-062.4802
2026-08-071.1940
2026-08-082.1181
2026-08-092.1181
2026-08-101.9387
2026-08-112.4272
2026-08-121.8281
2026-08-133.1313
2026-08-142.9133
2026-08-152.6884
2026-08-162.6884
2026-08-171.7323
2026-08-183.2248
2026-08-193.6710
2026-08-201.0257
2026-08-211.4105
2026-08-222.9490
2026-08-232.9490
2026-08-242.9483
2026-08-252.7990
2026-08-262.2034
2026-08-272.6132
2026-08-282.0910
2026-08-293.0358
2026-08-303.0358
2026-08-312.4645
2026-09-022.8634
2026-09-031.0621
2026-09-042.6778
2026-09-052.1778
2026-09-062.1778
2026-09-072.4438
2026-09-081.5358
2026-09-092.1904
2026-09-102.8389
2026-09-112.6369
2026-09-122.3235
2026-09-132.3235
2026-09-143.4855
2026-09-152.5167

Understanding SILVER Contract M27

This page displays the complete lifecycle of contract M27 for SILVER. The statistics panel shows key metrics — first and last recorded values, minimum, maximum, and the arithmetic mean over the entire life of this specific contract.

The chart visualizes the full forward curve for SILVER M27 from the first recorded date to the most recent update, based on {count} historical data points. This allows you to analyze how forward points evolved as the contract approached expiration, revealing any structural shifts in the SILVER forward curve.


How SILVER M27 Forward Points Feed Into Margin Zones and Option Levels

Spot-only margin zones and option levels for SILVER lose accuracy as the M27 expiry approaches, because they ignore the interest rate cost embedded in the forward curve. Adding the forward points recorded for M27 corrects this drift, keeping the zones and levels aligned with where the market actually prices SILVER risk for this expiry.

The {count} data points collected for SILVER M27 let you see exactly how that adjustment has moved over the life of the contract, instead of relying on a single spot value.


FAQ: SILVER M27 Forward Points

How many historical records are available for SILVER M27?

This page currently holds {count} recorded forward points values for SILVER contract M27, covering the full history from the first recorded date to the latest update.

Why do min/max/average matter for M27?

The minimum, maximum, and average for SILVER contract M27 show how wide the forward curve has swung over its lifetime. A narrow range suggests stable rate differentials, while a wide range signals larger shifts in relative interest rates between the two currencies during this contract's life.

How does M27 data help with margin zones and option levels for SILVER?

The forward points recorded for M27 reflect the cost of carry priced into SILVER for this specific expiry. Using this data alongside spot price keeps margin zones and option levels adjusted for that cost, rather than based on spot alone.